IT Cloud Network logoIT Cloud Network
Schedule assessment
solutions/data center
Data Center

Compute, facilities, and operations.

Servers, racks, power, and structured cabling — designed to fit the systems that ride on top, with the day-2 operations plan written before day 1.

Racks deployed8,400+
Cable terminations1.2M+
On-time delivery98.7%
What we do

Designed, deployed, and optionally operated.

01

Server platforms

Rack, blade, and composable compute — sized to workload, not vendor SKU sheet.

02

Rack & power design

Layout, PDU planning, cable management, and cooling profiles. The work that prevents 2 a.m. calls later.

03

Structured cabling

Fiber, copper, and pathway design. Done well, documented, and labeled to a standard your ops team will thank us for.

04

OOB management

Console servers, serial infrastructure, and out-of-band paths that work when the network does not.

05

Moves & consolidations

Data center moves, mergers, and decommissions — including the asset disposition no one else wants to handle.

06

Edge & micro-DCs

Containerized and rack-scale edge sites for retail, manufacturing, and remote operations.

Engagement

How a project actually runs.

No SOW that reads like vendor-speak. A clear plan with checkpoints your team owns.

PHASE 01
Site survey
Power, cooling, weight, and pathway assessment. Photographs and a floor plan that matches reality.
1 week
PHASE 02
Design
Rack elevations, PDU schedules, cable schedules, and labeling standards.
2 weeks
PHASE 03
Build
Off-hours installation with an on-site project manager. Daily walk-throughs.
3–8 weeks
PHASE 04
Commission
Power-on, validation, and as-built documentation handed to your team.
1 week
Stack

Authorized partners across the layer.

Compute
  • Dell PowerEdge
  • HPE ProLiant
  • Cisco UCS
  • Supermicro
  • Lenovo ThinkSystem
Power
  • Schneider APC
  • Vertiv
  • Eaton
  • Server Technology
  • Raritan
Cabling
  • Panduit
  • CommScope
  • Corning
  • Belden
  • Leviton
OOB
  • Opengear
  • Lantronix
  • ZPE Nodegrid
  • Avocent
Outcomes

What customers walk away with.

98.7%
On-time project delivery
Across 8,400+ racks deployed.
0
Power events post-cutover
Last 24 build engagements.
< 1%
Cable error rate
On terminations at handoff.
15 yr
Avg facilities lead tenure
Same engineers, project after project.

Ready to talk through data center?

A 30-minute conversation, not a sales call. We'll tell you whether we're a fit — and if we're not, who is.